Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,685

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0492 #09 Y:2016 Install compressor air intakes in coolest locations $485 $1,200
BD0492 #08 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $529 $75
BD0492 #07 Y:2016 Install occupancy sensors $476 $600
BD0492 #06 Y:2016 Reduce the pressure of compressed air to the minimum required $1,039 $20
BD0492 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,299 $6,032
BD0492 #04 Y:2016 Turn off equipment during breaks, reduce operating time $3,305 $500
BD0492 #03 Y:2016 Utilize energy-efficient belts and other improved mechanisms $8,352 $2,600
BD0492 #02 Y:2016 Insulate bare equipment $10,912 $4,050
BD0492 #01 Y:2016 Use most efficient type of electric motors $17,166 $21,060
BD0491 #11 Y:2016 Utilize higher efficiency lamps and/or ballasts $209 $190
BD0491 #10 Y:2016 Insulate bare equipment $601 $1,800
BD0491 #09 Y:2016 Install occupancy sensors $778 $600
BD0491 #08 Y:2016 Install compressor air intakes in coolest locations $1,064 $500
BD0491 #07 Y:2016 Utilize energy-efficient belts and other improved mechanisms $1,131 $2,800
BD0491 #06 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,427 $1,000
BD0491 #05 Y:2016 Utilize controls to operate equipment only when needed $1,456 $2,700
BD0491 #04 Y:2016 Reduce the pressure of compressed air to the minimum required $1,994 $20
BD0491 #03 Y:2016 Use waste heat from hot flue gases to preheat $3,307 $7,500
BD0491 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $6,310 $30,685
BD0491 #01 Y:2016 Use most efficient type of electric motors $5,795 $6,550