Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,374

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0112 #13 Y:1993 Use most efficient type of electric motors $11,104 $16,099
AS0112 #12 Y:1993 Use synthetic lubricant $4,287 $4,235
AS0112 #11 Y:1993 Reduce the pressure of compressed air to the minimum required $1,886 -
AS0112 #10 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $2,970 $700
AS0112 #09 Y:1993 Repair and eliminate steam leaks $305 $400
AS0112 #08 Y:1993 Use heat from boiler blowdown to preheat boiler feed water $2,341 $7,000
AS0112 #07 Y:1993 Use waste heat from hot flue gases to preheat $4,941 $16,000
AS0112 #06 Y:1993 Analyze flue gas for proper air/fuel ratio $1,694 $4,000
AS0112 #05 Y:1993 Use photocell controls $1,035 $400
AS0112 #04 Y:1993 Install occupancy sensors $1,508 $525
AS0112 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $4,174 $9,280
AS0112 #02 Y:1993 Utilize higher efficiency lamps and/or ballasts $14,310 $37,932
AS0112 #01 Y:1993 Utilize higher efficiency lamps and/or ballasts $11,087 $15,256
AS0111 #09 Y:1993 Analyze flue gas for proper air/fuel ratio $1,932 $2,000
AS0111 #08 Y:1993 Use synthetic lubricant $1,758 $2,330
AS0111 #07 Y:1993 Install compressor air intakes in coolest locations $749 $500
AS0111 #06 Y:1993 Use cascade system of recirculating during cold weather to avoid sub-cooling $4,008 $12,000
AS0111 #05 Y:1993 Use adjustable frequency drive or multiple speed motors on existing system $626 $3,044
AS0111 #04 Y:1993 Use most efficient type of electric motors $2,395 $2,054
AS0111 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $207 $340