Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,607

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM37 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,071 $207
MUCM37 #03 Y:2026 Install / repair insulation on steam lines $262 $97
MUCM37 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,015 $14,417
MUCM37 #01 Y:2026 Install occupancy sensors $6,709 $14,664
MI0474 #07 Y:2026 Install occupancy sensors $1,524 $4,106
MI0474 #06 Y:2026 Insulate bare equipment $543 $1,164
MI0474 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $442 $852
MI0474 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,408 $2,359
MI0474 #03 Y:2026 Eliminate or reduce compressed air usage $11,967 $2,220
MI0474 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $11,424 $1,576
MI0474 #01 Y:2026 Use solar heat to make electricty $55,819 $1,840
SJ0051 #07 Y:2026 Turn off equipment when not in use $13,400 -
SJ0051 #06 Y:2026 Use solar heat to make electricty $36,651 $441,432
SJ0051 #05 Y:2026 Recover waste heat from equipment $6,879 $2,016
SJ0051 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,152 $2,470
SJ0051 #03 Y:2026 Eliminate or reduce compressed air usage $2,502 -
SJ0051 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,282 -
SJ0051 #01 Y:2026 Use or replace with energy efficient substitutes $73,526 $26,084
SD0693 #10 Y:2026 Use heat pump for space conditioning $74,010 $21,175
SD0693 #09 Y:2026 Recharge batteries on during off-peak demand periods $14,692 -