Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,803

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0650 #04 Y:2026 Change rate schedules or other changes in utility service $137,573 $305,377
SF0650 #03 Y:2026 Use minimum steam operating pressure $2,009 $1,080
SF0650 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $6,329 $160
SF0650 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $49,625 -
MUCM36 #10 Y:2026 Install occupancy sensors $134 $344
MUCM36 #09 Y:2026 Use proper thickness of insulation on building envelope $136 $254
MUCM36 #08 Y:2026 Use most efficient type of electric motors $156 $805
MUCM36 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $377 $1,633
MUCM36 #06 Y:2026 Utilize sensors controlling roof and wall openings $578 $349
MUCM36 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $582 $1,672
MUCM36 #04 Y:2026 Reduce space conditioning during non-working hours $715 $1,128
MUCM36 #03 Y:2026 Replace boiler $5,317 $29,813
MUCM36 #02 Y:2026 Lower temperature during the winter season and vice-versa $6,408 -
MUCM36 #01 Y:2026 Use solar heat to make electricty $25,241 $220,400
MUCM35 #14 Y:2026 Install partitions to reduce size of conditioned space $1,858 $6
MUCM35 #13 Y:2026 Install vinyl strip / high speed / air curtain doors $2,294 $7,582
MUCM35 #12 Y:2026 Close holes and openings in building such as broken windows $98 $85
MUCM35 #11 Y:2026 Reduce space conditioning during non-working hours $3,679 $15,464
MUCM35 #10 Y:2026 Lower temperature during the winter season and vice-versa $611 -
MUCM35 #09 Y:2026 Lower temperature during the winter season and vice-versa $4,491 -