ITAC Assessment: MUCM36
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product none
NAICS 712130: Zoos and Botanical Gardens
SIC 8422: Arboreta and Botanical or Zoological Gardens
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 77,507
ft2
Annual Production 1
units
Production Hrs. Annual 3,640
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,667 1,492,967
kWh
Electricity Demand $129,862 3,176
kW-mo/yr
Electricity Fees $21,443 -
Natural Gas $28,117 12,442
MMBtu
Other Energy $14,011 1
MMBtu
TOTAL YEARLY COSTS $254,100
RECOMMENDED SAVINGS* $39,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $25,241 $220,400 $5,887
143,584
kWh
$19,355
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $6,408 - $111
2,698
kWh
$452
-
kW-mo/yr
$5,846
-
MMBtu
03 2.1224: Replace boiler $5,317 $29,813 - - $5,317
-
MMBtu
04 2.7224: Reduce space conditioning during non-working hours $715 $1,128 $138
3,348
kWh
$561
-
kW-mo/yr
$17
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $582 $1,672 $246
5,992
kWh
$336
-
kW-mo/yr
-
06 2.7446: Utilize sensors controlling roof and wall openings $578 $349 - - $578
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $377 $1,633 $58
1,407
kWh
$320
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $156 $805 $24
581
kWh
$132
-
kW-mo/yr
-
09 2.7492: Use proper thickness of insulation on building envelope $136 $254 $25
603
kWh
$82
-
kW-mo/yr
$30
-
MMBtu
10 2.7135: Install occupancy sensors $134 $344 $31
762
kWh
$103
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,646 $256,398 $6,518
158,974
kWh
$21,339
-
kW-mo/yr
$11,788
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs