Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,738

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0346 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,665 $3,200
IC0346 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $788 $926
IC0346 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $313 $346
IC0346 #02 Y:2026 Install / repair insulation on steam lines $11,700 $94,345
IC0346 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $296 -
LS0426 #04 Y:2026 Replace heat treating oven with more efficient unit $2,523 $10,000
LS0426 #03 Y:2026 Use or replace with energy efficient substitutes $5,327 $15,000
LS0426 #02 Y:2026 Install occupancy sensors $1,732 $625
LS0426 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,415 $3,547
LS0326 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,593 $1,439
LS0326 #03 Y:2026 Install occupancy sensors $1,563 $625
LS0326 #02 Y:2026 Reduce heat gain by window tinting $12,072 $2,520
LS0326 #01 Y:2026 Reduce space conditioning during non-working hours $5,549 $175
UD1133 #09 Y:2026 Install occupancy sensors $205 $218
UD1133 #08 Y:2026 Use hot process fluids to preheat incoming process fluids $7,222 $2,552
UD1133 #07 Y:2026 Turn off equipment during breaks, reduce operating time $9,566 -
UD1133 #06 Y:2026 Install motor voltage controller on lightly loaded motors $15,204 $8,166
UD1133 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $18,109 $953
UD1133 #04 Y:2026 Install compressor air intakes in coolest locations $23,389 $4,800
UD1133 #03 Y:2026 Recover mechanical energy $53,790 $13,165