| Assessment Year | 2026 |
|---|---|
| Principal Product | Metal Finishing and Plating of Customer Parts |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $10 M to 50M |
| # of Employees | 92 |
| Plant Area |
61,100
ft2
|
| Annual Production | 50,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $161,729 | 3,488,398 |
kWh
|
$0.046 | |
| Electricity Demand | $144,076 | 7,949 |
kW-mo/yr
|
$18.13 | |
| Electricity Fees | $81,397 | - |
|
- | |
| Natural Gas | $298,902 | 62,721 |
MMBtu
|
$4.77 | |
| Other Gas | $17,367 | 1 |
MMBtu
|
$17,367.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $55,697 | 11,912 |
Tgal
|
$4.68 | |
| Water Disposal | $42,520 | 8,773 |
Tgal
|
$4.85 | |
| TOTAL YEARLY COSTS | $801,688 | ||||
| RECOMMENDED SAVINGS* | $147,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $296 | - |
$186
4,044
kWh
|
$110
-
kW-mo/yr
|
- | |
| 02 | 2.2136: Install / repair insulation on steam lines | $11,700 | $94,345 | - | - |
$11,700
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $313 | $346 |
$196
4,256
kWh
|
$120
-
kW-mo/yr
|
$(-3.3)
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $788 | $926 |
$448
9,749
kWh
|
$340
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,665 | $3,200 |
$2,713
58,968
kWh
|
$1,952
-
kW-mo/yr
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,424 | $27,615 |
$6,500
141,302
kWh
|
$4,924
-
kW-mo/yr
|
- | |
| 07 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $19,018 | $66,675 | - | - |
$19,018
-
MMBtu
|
|
| 08 | 2.9114: Use solar heat to make electricty | $97,303 | $441,248 |
$29,969
651,499
kWh
|
$67,334
-
kW-mo/yr
|
- | |
| 09 | 2.4322: Use or replace with energy efficient substitutes | $382 | $120 |
$223
4,841
kWh
|
$159
-
kW-mo/yr
|
- | |
| 10 | 2.3132: Recharge batteries on during off-peak demand periods | $1,696 | - | - |
$1,696
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $147,584 | $634,475 |
$40,234
874,659
kWh
|
$76,635
-
kW-mo/yr
|
$30,715
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs