| SF0644 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $13,685 | $23,706 | |
| SF0644 #09 Y:2025 | 09 | 2025 | Change rate schedules or other changes in utility service | $87,216 | $146,113 | |
| SF0644 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $9,207 | $8,069 | |
| SF0644 #07 Y:2025 | 07 | 2025 | Re-size charging openings or add movable cover or door | $8,178 | $5,000 | |
| SF0644 #06 Y:2025 | 06 | 2025 | Repair faulty insulation in furnaces, boilers, etc | $11,403 | $3,643 | |
| SF0644 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,268 | $350 | |
| SF0644 #04 Y:2025 | 04 | 2025 | Reduce space conditioning during non-working hours | $11,683 | $2,000 | |
| SF0644 #03 Y:2025 | 03 | 2025 | Use demand controller or load shedder | $69,072 | - | |
| SF0644 #02 Y:2025 | 02 | 2025 | Turn off equipment when not in use | $1,847 | - | |
| SF0644 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,914 | - | |
| MS0461 #10 Y:2025 | 10 | 2025 | Apply for tax-free status for energy purchases | $9,220 | - |
n/a
|
| MS0461 #09 Y:2025 | 09 | 2025 | Utilize higher efficiency lamps and/or ballasts | $4,862 | $20,295 |
n/a
|
| MS0461 #08 Y:2025 | 08 | 2025 | Install timers and/or thermostats | $15,624 | $1,339 |
n/a
|
| MS0461 #07 Y:2025 | 07 | 2025 | Turn off equipment when not in use | $5,369 | - |
n/a
|
| MS0461 #06 Y:2025 | 06 | 2025 | Lower temperature during the winter season and vice-versa | $3,769 | - |
n/a
|
| MS0461 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,305 | - |
n/a
|
| MS0461 #04 Y:2025 | 04 | 2025 | Replace fossil fuel equipment with electrical equipment | $4,769 | $50,000 |
n/a
|
| MS0461 #03 Y:2025 | 03 | 2025 | Schedule deliveries according to demand | $50,000 | $318,000 |
n/a
|
| MS0461 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $184 | $2,514 |
n/a
|
| MS0461 #01 Y:2025 | 01 | 2025 | Re-arrange equipment layout to reduce labor costs | $4,800 | $2,500 |
n/a
|