Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,646

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0590 #08 Y:2026 Conserve energy by efficient use of vending machines $171 $520
SU0590 #07 Y:2026 Install / repair insulation on steam lines $562 $1,047
SU0590 #06 Y:2026 Use or replace with energy efficient substitutes $261 $392
SU0590 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $945 $886
SU0590 #04 Y:2026 Use or replace with energy efficient substitutes $515 $38
SU0590 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $936 $40
SU0590 #02 Y:2026 Eliminate or reduce compressed air usage $1,332 -
SU0590 #01 Y:2026 Apply for tax-free status for energy purchases $1,330 $30
MU0084 #07 Y:2026 Pay bills on time to avoid late fees $16,942 -
MU0084 #06 Y:2026 Keep doors and windows shut when not on use $67 -
MU0084 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $205 $987
MU0084 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,615 $3,336
MU0084 #03 Y:2026 Install occupancy sensors $206 $1,222
MU0084 #02 Y:2026 Recover heat from exhausted steam, hot air or hot water $9,084 $9,725
MU0084 #01 Y:2026 Optimize plant power factor $74,251 $77,040
GT1004 #09 Y:2026 Optimize plant power factor $2,865 $16,238
GT1004 #08 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $131,105 $517,500
GT1004 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,538 $6,960
GT1004 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,648 $15,000
GT1004 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,186 $703