Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,346

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0037 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,403 $5,609
NT0037 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $577 $1,901
MU0061 #09 Y:2024 Install partitions to reduce size of conditioned space $370 $1,608
MU0061 #08 Y:2024 Install timers and/or thermostats $393 $580
MU0061 #07 Y:2024 Use radiant heater for spot heating $2,592 $10,260
MU0061 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $89 $114
MU0061 #05 Y:2024 Install occupancy sensors $246 $339
MU0061 #04 Y:2024 Install set-back timers $24,478 $160,704
MU0061 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,134 -
MU0061 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,426 $12,734
MU0061 #01 Y:2024 Recharge batteries on during off-peak demand periods $3,468 $4,140
WM0232 #05 Y:2024 Install occupancy sensors $778 $800
WM0232 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,332 $2,750
WM0232 #03 Y:2024 Reduce space conditioning during non-working hours $3,500 $360
WM0232 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,625 $22,658
WM0232 #01 Y:2024 Use / purchase optimum sized compressor $11,149 $46,220
KS2435 #06 Y:2024 Use solar heat to make electricty $24,479 $193,329
KS2435 #05 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,807 -
KS2435 #04 Y:2024 Recover heat from exhausted steam, hot air or hot water $1,393 $3,705
KS2435 #03 Y:2024 Keep doors and windows shut when not on use $597 -