Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,596

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2613 #05 Y:2026 Use outside cold water source as a supply of cooling water $43,299 $98,575
UL2613 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,937 $945
UL2613 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $4,409 -
UL2613 #02 Y:2026 Improve air circulation with destratification fans / other methods $6,794 $10,000
UL2613 #01 Y:2026 Install occupancy sensors $269 $106
TR0079 #05 Y:2026 Use solar heat to make electricty $138,084 $365,341
TR0079 #04 Y:2026 Install compressor air intakes in coolest locations $1,173 $615
TR0079 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,510 $3,924
TR0079 #02 Y:2026 Use or replace with energy efficient substitutes $10,784 $27,400
TR0079 #01 Y:2026 Begin a practice of predictive / preventative maintenance $10,400 $1,650
SU0608 #10 Y:2026 Install compressor air intakes in coolest locations $80 $352
SU0608 #09 Y:2026 Conserve energy by efficient use of vending machines $429 $1,559
SU0608 #08 Y:2026 Use or replace with energy efficient substitutes $538 $1,009
SU0608 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $584 $122
SU0608 #06 Y:2026 Reduce space conditioning during non-working hours $190 -
SU0608 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $194 -
SU0608 #04 Y:2026 Eliminate/reduce an operation $2,913 -
SU0608 #03 Y:2026 Install spectral reflectors / delamp $878 -
SU0608 #02 Y:2026 Apply for tax-free status for energy purchases $4,915 -
SU0608 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,444 -