Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Power laundries, family and commercial
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0260 #09 Y:2025 Eliminate or reduce compressed air usage $4,105 -
DL0260 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $19,619 $9,000
DL0260 #07 Y:2025 Remove or close off unneeded compressed air lines $1,580 -
DL0260 #06 Y:2025 Use / purchase optimum sized compressor $15,800 $60,000
DL0260 #05 Y:2025 Minimize use of outside make-up air for ventilation except when used for economizer cycle $4,400 $20,000
DL0260 #04 Y:2025 Reduce combustion air flow to optimum $1,763 $5,000
DL0260 #03 Y:2025 Recover waste heat from equipment $58,770 $200,000
DL0260 #02 Y:2025 Increase amount of condensate returned $4,398 -
DL0260 #01 Y:2025 Recover heat from exhausted steam, hot air or hot water $30,961 $16,000
IA0529 #06 Y:2014 Use steam condensate for hot water supply (non-potable) $1,950 $5,000
IA0529 #05 Y:2014 Install spectral reflectors / delamp $569 $210
IA0529 #04 Y:2014 Install / repair insulation on steam lines $373 $1,155
IA0529 #03 Y:2014 Install vinyl strip / high speed / air curtain doors $214 $284
IA0529 #02 Y:2014 Use most efficient type of electric motors $2,154 $7,444
IA0529 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $5,348 $21,947
DL0117 #05 Y:2013 Turn off equipment when not in use $23,476 $5,870
DL0117 #04 Y:2013 Recover waste heat from equipment $138,552 $277,104
DL0117 #03 Y:2013 Utilize higher efficiency lamps and/or ballasts $6,400 $6,000
DL0117 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $60,922 $5,695
DL0117 #01 Y:2013 Upgrade controls on compressors $3,345 $500