ITAC Assessment: IA0529
ITAC logo
ITAC Assessment: IA0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Customized and Laundered Uniforms
NAICS 812320: Drycleaning and Laundry Services (except Coin-Operated)
SIC 7211: Power Laundries, Family and Commercial
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area 36,500
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,730
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,806 596,560
kWh
Electricity Demand $14,437 2,787
kW-mo/yr
Electricity Fees $7,332 -
Natural Gas $77,587 12,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,348 $21,947 $4,214
67,204
kWh
$1,134
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $2,154 $7,444 $1,579
25,185
kWh
$575
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $214 $284 - - $214
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $373 $1,155 - - $373
-
MMBtu
05 2.7144: Install spectral reflectors / delamp $569 $210 $417
6,650
kWh
$152
-
kW-mo/yr
-
06 2.2128: Use steam condensate for hot water supply (non-potable) $1,950 $5,000 - - $1,950
-
MMBtu
TOTAL RECOMMENDED $10,608 $36,040 $6,210
99,039
kWh
$1,861
-
kW-mo/yr
$2,537
-
MMBtu
TOTAL IMPLEMENTED $10,608 $36,040 $6,210
99,039
kWh
$1,861
-
kW-mo/yr
$2,537
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs