Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hotels and motels
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ1016 #06 Y:2025 Install occupancy sensors $71 $475
MZ1016 #05 Y:2025 Utilize a less expensive cooling method $2,671 $3,750
MZ1016 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,026 $6,750
MZ1016 #03 Y:2025 Minimize water usage $5,716 $2,500
MZ1016 #02 Y:2025 Replace existing equipment with more suitable substitutes $178 $2,000
MZ1016 #01 Y:2025 Replace existing equipment with more suitable substitutes $3,556 $8,000
MZ1015 #08 Y:2025 Reduce ventilation air $3,316 $5,000
MZ1015 #07 Y:2025 Utilize a less expensive cooling method $3,409 $3,750
MZ1015 #06 Y:2025 Chill water to the highest temperature possible $5,010 $8,640
MZ1015 #05 Y:2025 Reduce hot water temperature to the minimum required $789 -
MZ1015 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $14,776 $6,332
MZ1015 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $517 $496
MZ1015 #02 Y:2025 Use solar heat to heat water $3,319 $23,760
MZ1015 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,677 $4,600
MS0427 #03 Y:2024 Use solar heat to make electricty $16,714 $131,059
MS0427 #02 Y:2024 Install occupancy sensors $963 $1,105
MS0427 #01 Y:2024 Reduce heat gain by window tinting $3,989 $14,159
UU0243 #07 Y:2023 Optimize plant power factor $1,900 $6,000
UU0243 #06 Y:2023 Use cooling tower or economizer to replace chiller cooling $2,800 $6,300
UU0243 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,244 $14,145