Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicle dealers (new and used)
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0025 #06 Y:2024 Change operating conditions $150,000 $1,200,000
NT0025 #05 Y:2024 Optimize plant power factor $2,643 $1,302
NT0025 #04 Y:2024 Install equipment (eg compactor) to reduce disposal costs $36,410 $21,995
NT0025 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $6,511 $906
NT0025 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,914 $5,609
NT0025 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $4,136 -
MUCM05 #07 Y:2022 Use photocell controls $297 $1,146
MUCM05 #06 Y:2022 Install occupancy sensors $250 $195
MUCM05 #05 Y:2022 Turn off equipment when not in use $2,554 -
MUCM05 #04 Y:2022 Turn off equipment when not in use $495 -
MUCM05 #03 Y:2022 Utilize controls to operate equipment only when needed $2,312 -
MUCM05 #02 Y:2022 Reduce illumination to minimum necessary levels $40 -
MUCM05 #01 Y:2022 Reduce space conditioning during non-working hours $7,550 -
UF0421 #09 Y:2009 Develop a repair/replace policy $2,717 -
UF0421 #08 Y:2009 Turn off equipment during breaks, reduce operating time $16,017 -
UF0421 #07 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $5,873 $515
UF0421 #06 Y:2009 Utilize higher efficiency lamps and/or ballasts $12,375 $8,700
UF0421 #05 Y:2009 Use separate switches on perimeter lighting which may be turned off when natural light is available $3,680 $2,262
UF0421 #04 Y:2009 Install skylights $1,691 $11,790
UF0421 #03 Y:2009 Install common header on compressors $2,293 -