31
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LT8423 #04 Y:2025 | 04 | 2025 | Replace existing hvac unit with high efficiency model | $4,732 | $29,880 |
n/a
|
LT8423 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,935 | $848 |
n/a
|
LT8423 #02 Y:2025 | 02 | 2025 | Use most efficient type of electric motors | $998 | $1,151 |
n/a
|
LT8423 #01 Y:2025 | 01 | 2025 | Use photocell controls | $171 | $179 |
n/a
|
NT0025 #06 Y:2024 | 06 | 2024 | Change operating conditions | $150,000 | $1,200,000 | |
NT0025 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $2,643 | $1,302 | |
NT0025 #04 Y:2024 | 04 | 2024 | Install equipment (eg compactor) to reduce disposal costs | $36,410 | $21,995 | |
NT0025 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,511 | $906 | |
NT0025 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,914 | $5,609 | |
NT0025 #01 Y:2024 | 01 | 2024 | Reduce the pressure of compressed air to the minimum required | $4,136 | - | |
LS1323 #05 Y:2023 | 05 | 2023 | Use solar heat to make electricty | $11,358 | $34,650 | |
LS1323 #04 Y:2023 | 04 | 2023 | Utilize higher efficiency lamps and/or ballasts | $535 | $544 | |
LS1323 #03 Y:2023 | 03 | 2023 | Install timers and/or thermostats | $890 | $150 | |
LS1323 #02 Y:2023 | 02 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,720 | $135 | |
LS1323 #01 Y:2023 | 01 | 2023 | Install occupancy sensors | $969 | $50 | |
MUCM05 #07 Y:2022 | 07 | 2022 | Use photocell controls | $297 | $1,146 | |
MUCM05 #06 Y:2022 | 06 | 2022 | Install occupancy sensors | $250 | $195 | |
MUCM05 #05 Y:2022 | 05 | 2022 | Turn off equipment when not in use | $2,554 | - | |
MUCM05 #04 Y:2022 | 04 | 2022 | Turn off equipment when not in use | $495 | - | |
MUCM05 #03 Y:2022 | 03 | 2022 | Utilize controls to operate equipment only when needed | $2,312 | - |