ITAC Assessment: LT8423
ITAC logo
ITAC Assessment: LT8423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product gasoline service station
NAICS 447110: Gasoline Stations with Convenience Stores
SIC 5541: Gasoline Service Stations
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 91,443
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,911 591,424
kWh
Electricity Demand $24,755 1,577
kW-mo/yr
Electricity Fees $5,079 -
Natural Gas $1,804 124
MMBtu
Waste Disposal Costs
Water Usage $5,146 386
Tgal
Water Disposal $594 386
Tgal
TOTAL YEARLY COSTS $69,289
RECOMMENDED SAVINGS* $7,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7134: Use photocell controls $171 $179 $171
3,165
kWh
-
02 2.4133: Use most efficient type of electric motors $998 $1,151 $665
12,324
kWh
$333
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,935 $848 $1,280
23,718
kWh
$655
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $4,732 $29,880 $2,210
40,960
kWh
$2,522
-
kW-mo/yr
TOTAL RECOMMENDED $7,835 $32,057 $4,326
80,166
kWh
$3,510
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs