Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wholesale trade-non-durable goods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0463 #05 Y:2025 Install partitions to reduce size of conditioned space $13,397 $26,570
MI0463 #04 Y:2025 Turn off equipment during breaks, reduce operating time $10,085 $1,600
MI0463 #03 Y:2025 Reduce space conditioning during non-working hours $4,194 -
MI0463 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,549 -
MI0463 #01 Y:2025 Recharge batteries on during off-peak demand periods $4,871 -
MI0461 #05 Y:2025 Replace existing hvac unit with high efficiency model $6,646 $33,112
MI0461 #04 Y:2025 Turn off equipment during breaks, reduce operating time $3,684 $2,240
MI0461 #03 Y:2025 Lower temperature during the winter season and vice-versa $4,724 $1,840
MI0461 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,685 -
MI0461 #01 Y:2025 Recharge batteries on during off-peak demand periods $7,156 -
NL0109 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $400 $1,000
NL0109 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,783 $2,080
NL0109 #03 Y:2025 Apply for tax-free status for energy purchases $4,510 $2,000
NL0109 #02 Y:2025 Use flow control valves on equipment to optimize water use $12,694 $500
NL0109 #01 Y:2025 Replace existing chiller with high efficiency model $45,070 $240,000
LE0585 #05 Y:2024 Use solar heat to heat water $132,239 $658,000
LE0585 #04 Y:2024 Eliminate or reduce compressed air usage $11,641 $25,639
LE0585 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,395 $660
LE0585 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,317 $2,200
LE0585 #01 Y:2024 Install timers and/or thermostats $27,784 -