28
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0808 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $252,440 | $4,458,259 |
n/a
|
OR0808 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,143 | $30,877 |
n/a
|
OR0808 #04 Y:2025 | 04 | 2025 | Reduce illumination to minimum necessary levels | $3,076 | - |
n/a
|
OR0808 #03 Y:2025 | 03 | 2025 | Reduce ventilation air | $6,836 | - |
n/a
|
OR0808 #02 Y:2025 | 02 | 2025 | Use cold waste water to cool chiller feed water | $8,055 | - |
n/a
|
OR0808 #01 Y:2025 | 01 | 2025 | Reduce ventilation air | $13,430 | - |
n/a
|
CI0010 #07 Y:2023 | 07 | 2023 | Turn off equipment when not in use | $245 | - | |
CI0010 #06 Y:2023 | 06 | 2023 | Recharge batteries on during off-peak demand periods | $1,125 | $50 | |
CI0010 #05 Y:2023 | 05 | 2023 | Install occupancy sensors | $1,203 | $500 | |
CI0010 #04 Y:2023 | 04 | 2023 | Turn off equipment when not in use | $4,003 | - | |
CI0010 #03 Y:2023 | 03 | 2023 | Insulate glazing, walls, ceilings, and roofs | $7,488 | $12,300 | |
CI0010 #02 Y:2023 | 02 | 2023 | Use solar heat to make electricty | $13,459 | $115,417 | |
CI0010 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $18,279 | $12,078 | |
WM0054 #08 Y:2014 | 08 | 2014 | Minimize water usage | $1,764 | $6,315 | |
WM0054 #07 Y:2014 | 07 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $232 | $720 | |
WM0054 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $1,194 | $4,048 | |
WM0054 #05 Y:2014 | 05 | 2014 | Use solar heat to make electricty | $934 | - | |
WM0054 #04 Y:2014 | 04 | 2014 | Insulate bare equipment | $2,363 | $2,000 | |
WM0054 #03 Y:2014 | 03 | 2014 | Replace existing chiller with high efficiency model | $2,335 | $10,000 | |
WM0054 #02 Y:2014 | 02 | 2014 | Maintain air filters by cleaning or replacement | $1,524 | $330 |