30
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UD1077 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $6,384 | $78,400 | |
UD1077 #03 Y:2023 | 03 | 2023 | Insulate glazing, walls, ceilings, and roofs | $145 | $550 | |
UD1077 #02 Y:2023 | 02 | 2023 | Use heat pump for space conditioning | $2,002 | $25,200 | |
UD1077 #01 Y:2023 | 01 | 2023 | Use radiant heater for spot heating | $1,038 | $5,500 | |
DL0097 #09 Y:2012 | 09 | 2012 | Install timers on light switches in little used areas | $590 | $100 | |
DL0097 #08 Y:2012 | 08 | 2012 | Utilize controls to operate equipment only when needed | $570 | $100 | |
DL0097 #07 Y:2012 | 07 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,570 | $2,500 | |
DL0097 #06 Y:2012 | 06 | 2012 | Turn off equipment when not in use | $3,800 | $500 | |
DL0097 #05 Y:2012 | 05 | 2012 | Utilize controls to operate equipment only when needed | $6,780 | $500 | |
DL0097 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $9,670 | $40,320 | |
DL0097 #03 Y:2012 | 03 | 2012 | Lower temperature during the winter season and vice-versa | $8,900 | $100 | |
DL0097 #02 Y:2012 | 02 | 2012 | Replace fossil fuel equipment with electrical equipment | $3,650 | $2,490 | |
DL0097 #01 Y:2012 | 01 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $11,670 | $100 | |
IC0167 #08 Y:2009 | 08 | 2009 | Conserve energy by efficient use of vending machines | $452 | - | |
IC0167 #07 Y:2009 | 07 | 2009 | Upgrade controls on compressors | $3,067 | $8,134 | |
IC0167 #06 Y:2009 | 06 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $137 | $115 | |
IC0167 #05 Y:2009 | 05 | 2009 | Install / repair insulation on steam lines | $1,524 | $1,260 | |
IC0167 #04 Y:2009 | 04 | 2009 | Repair and eliminate steam leaks | $875 | $400 | |
IC0167 #03 Y:2009 | 03 | 2009 | Analyze flue gas for proper air/fuel ratio | $7,193 | - | |
IC0167 #02 Y:2009 | 02 | 2009 | Utilize higher efficiency lamps and/or ballasts | $1,522 | $458 |