ITAC Assessment: DL0097
ITAC logo
ITAC Assessment: DL0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product High speed mailroom automation equipment
NAICS 423420: Office Equipment Merchant Wholesalers
SIC 5044: Office Equipment
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 243,800
ft2
Annual Production 100
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,754 2,714,100
kWh
Electricity Demand $55,064 6,838
kW-mo/yr
Electricity Fees $9,138 -
Natural Gas $50,877 4,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,670 $100 $17,790
189,460
kWh
$(-6,120.0)
-
kW-mo/yr
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $3,650 $2,490 - $(-1,800.0)
-
kW-mo/yr
$5,450
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $8,900 $100 $2,390
25,420
kWh
- $6,510
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,670 $40,320 $9,670
116,160
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $6,780 $500 $4,700
85,700
kWh
$2,080
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $3,800 $500 $3,800
40,400
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,570 $2,500 $910
9,700
kWh
$660
-
kW-mo/yr
-
08 2.6231: Utilize controls to operate equipment only when needed $570 $100 $570
6,070
kWh
- -
09 2.7132: Install timers on light switches in little used areas $590 $100 $590
6,300
kWh
- -
TOTAL RECOMMENDED $47,200 $46,710 $40,420
479,210
kWh
$(-5,180.0)
-
kW-mo/yr
$11,960
-
MMBtu
TOTAL IMPLEMENTED $17,250 $3,100 $8,000
120,820
kWh
$2,740
-
kW-mo/yr
$6,510
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs