Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manufacturing industries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0171 #02 Y:2021 Install compressor air intakes in coolest locations $1,815 $1,500
WM0171 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,582 $3,000
IC0251 #03 Y:2021 Use waste heat from hot flue gases to generate steam $4,596 $2,567
IC0251 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,466 $1,457
IC0251 #01 Y:2021 Replace existing equipment with more suitable substitutes $83,331 $171,790
WM0170 #08 Y:2021 Install occupancy sensors $216 $260
WM0170 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $330 $182
WM0170 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $598 $880
WM0170 #05 Y:2021 Recharge batteries on during off-peak demand periods $1,828 $1,500
WM0170 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,851 $3,500
WM0170 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,204 $875
WM0170 #02 Y:2021 Install spectral reflectors / delamp $4,328 $3,000
WM0170 #01 Y:2021 Optimize plant power factor $5,931 $24,300
OR0743 #03 Y:2021 Store heated/ cooled water for use during peak demand periods $29,553 $281,475
OR0743 #02 Y:2021 Utilize daylight whenever possible in lieu of artificial light $4,808 $8,548
OR0743 #01 Y:2021 Change rate schedules or other changes in utility service $46,625 -
OK1051 #04 Y:2021 Reduce the pressure of compressed air to the minimum required $1,449 -
OK1051 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $4,614 $677
OK1051 #02 Y:2021 Optimize plant power factor $8,210 $4,500
OK1051 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $11,640 $7,393