Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0073 #07 Y:2004 Demolish old building to reduce tax and insurance bills $130 -
UU0073 #06 Y:2004 Add equipment/ operators to reduce production bottleneck $10,500 $15,000
UU0073 #05 Y:2004 Use demand controller or load shedder $2,700 $2,500
UU0073 #04 Y:2004 Reuse / recycle/ sell paper products $2,434 -
UU0073 #03 Y:2004 Install equipment (eg compactor) to reduce disposal costs $990 $6,000
UU0073 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,080 $860
UU0073 #01 Y:2004 Improve air circulation with destratification fans / other methods $8,250 $8,000
BD0267 #13 Y:2004 Automate payroll system $9,750 $2,500
BD0267 #12 Y:2004 Convert to electrostatic powder coating $11,120 $5,174
BD0267 #11 Y:2004 Use synthetic lubricant $124 $30
BD0267 #10 Y:2004 Use most efficient type of electric motors $173 $292
BD0267 #09 Y:2004 Use photocell controls $229 $250
BD0267 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $234 $210
BD0267 #07 Y:2004 Reduce the pressure of compressed air to the minimum required $364 -
BD0267 #06 Y:2004 Install occupancy sensors $749 $720
BD0267 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $818 $60
BD0267 #04 Y:2004 Use radiant heater for spot heating $2,983 $4,250
BD0267 #03 Y:2004 Re-size charging openings or add movable cover or door $3,575 $3,000
BD0267 #02 Y:2004 Reduce illumination to minimum necessary levels $4,548 $320
BD0267 #01 Y:2004 Re-size charging openings or add movable cover or door $14,742 $10,000