Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0492 #05 Y:1996 Recover waste heat from equipment $14,226 $6,000
UD0492 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,905 $7,030
UD0492 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $9,723 $24,961
UD0492 #02 Y:1996 Disconnect ballasts $2,618 -
UD0492 #01 Y:1996 Minimize operation of equipment maintained in standby condition $552 -
UD0469 #05 Y:1995 Install equipment (eg compactor) to reduce disposal costs $7,600 $20,000
UD0469 #04 Y:1995 Use a less expensive method of waste removal $1,522 $1,000
UD0469 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $227 $392
UD0469 #02 Y:1995 Minimize operation of equipment maintained in standby condition $2,980 $3,000
UD0469 #01 Y:1995 Combine utility meters $3,256 -
UD0356 #04 Y:1991 Reschedule plant operations or reduce load to avoid peaks $12,390 -
UD0356 #03 Y:1991 Keep lamps and reflectors clean $4,191 -
UD0356 #02 Y:1991 Utilize higher efficiency lamps and/or ballasts $3,964 -
UD0356 #01 Y:1991 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,491 -
UD0255 #04 Y:1987 Reduce illumination to minimum necessary levels $350 -
UD0255 #03 Y:1987 Recover waste heat from equipment $1,435 $2,000
UD0255 #02 Y:1987 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $1,509 $13
UD0255 #01 Y:1987 Use plant owned transformers or lease transformers $7,000 $8,000