ITAC Assessment: OD0154
ITAC logo
ITAC Assessment: OD0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Road Signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 27,000
ft2
Annual Production 750,000
thousand feet
Production Hrs. Annual 4,004
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,826 465,709
kWh
Electricity Demand $7,533 1,934
kW-mo/yr
Electricity Fees $1,491 -
Natural Gas $8,563 1,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,380 $3,814 $1,140
20,516
kWh
$240
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $884 $2,163 $826
12,309
kWh
$58
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $266 $200 $266
4,689
kWh
- - -
04 2.4314: Use synthetic lubricant $158 $13 $99
1,758
kWh
$21
-
kW-mo/yr
- $38
05 2.7224: Reduce space conditioning during non-working hours $1,218 $150 - - $1,218
-
MMBtu
-
06 2.7224: Reduce space conditioning during non-working hours $2,218 $135 $2,218
39,859
kWh
- - -
07 2.7124: Make a practice of turning off lights when not needed $70 - $70
1,172
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $155 $20 $155
2,931
kWh
- - -
09 2.7224: Reduce space conditioning during non-working hours $655 $150 $115
2,052
kWh
- $540
-
MMBtu
-
TOTAL RECOMMENDED $7,004 $6,645 $4,889
85,286
kWh
$319
-
kW-mo/yr
$1,758
-
MMBtu
$38
TOTAL IMPLEMENTED $266 $200 $266
4,689
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs