Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Photographic equipment and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0119 #06 Y:2019 Replace boiler $20,712 $66,681
IP0119 #05 Y:2019 Replace hydraulic / pneumatic equipment with electric equipment $27,937 $38,052
IP0119 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,002 $875
IP0119 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $2,082 $379
IP0119 #02 Y:2019 Lower temperature during the winter season and vice-versa $2,920 $460
IP0119 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $768 $28
OR0651 #03 Y:2015 Recover and reuse waste material $93,635 $132,280
OR0651 #02 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $270,822 $210,050
OR0651 #01 Y:2015 Minimize operation of equipment maintained in standby condition $58,422 $9,638
CO0690 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,080 $5,800
CO0690 #04 Y:2014 Improve air circulation with destratification fans / other methods $5,790 $28,490
CO0690 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $940 $370
CO0690 #02 Y:2014 Turn off equipment when not in use $1,180 -
CO0690 #01 Y:2014 Eliminate or reduce compressed air usage $1,730 $1,460
UD0870 #11 Y:2012 Reduce space conditioning during non-working hours $2,788 $3,000
UD0870 #10 Y:2012 Insulate bare equipment $1,512 -
UD0870 #09 Y:2012 Isolate hot or cold equipment $1,602 $4,000
UD0870 #08 Y:2012 Recover waste heat from equipment $2,567 $4,000
UD0870 #07 Y:2012 Use minimum steam operating pressure $7,517 -
UD0870 #06 Y:2012 Repair or replace steam traps $10,454 $1,800