Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Toner Cartridges
NAICS 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 3861: Photographic Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 1,538,402
ft2
Annual Production 712,500
units
Production Hrs. Annual 3,120
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $646,652 7,125,992
kWh
Electricity Demand $283,872 21,859
kW-mo/yr
Natural Gas $115,257 22,151
MMBtu
Waste Disposal Costs
Water Usage $8,666 3,978
Tgal
Water Disposal $10,383 3,978
Tgal
TOTAL YEARLY COSTS $1,064,830
RECOMMENDED SAVINGS* $214,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7226: Use computer programs to optimize hvac performance $83,523 $250,000 $73,002
804,871
kWh
- $10,521
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,407 $4,800 $30,407
335,248
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,893 $157,700 $25,893
285,489
kWh
- - -
04 2.1224: Replace boiler $18,200 $104,000 - - $18,200
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,687 - - $16,687
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,028 $1,500 $12,564
138,256
kWh
$2,464
-
kW-mo/yr
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $10,333 - $10,333
113,928
kWh
- - -
08 2.4239: Eliminate or reduce compressed air usage $7,336 $20,480 $7,336
80,890
kWh
- - -
09 3.4155: Meter waste water $4,799 $1,100 - - - $4,799
-
Tgal
10 2.4237: Substitute compressed air cooling with water or air cooling $2,373 $430 $2,373
26,164
kWh
- - -
TOTAL RECOMMENDED $214,579 $540,010 $161,908
1,784,846
kWh
$19,151
-
kW-mo/yr
$28,721
-
MMBtu
$4,799
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs