| Assessment Year | 2024 |
|---|---|
| Principal Product | Toner Cartridges |
| NAICS | 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing |
| SIC | 3861: Photographic Equipment and Supplies |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
1,538,402
ft2
|
| Annual Production | 712,500
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $646,652 | 7,125,992 |
kWh
|
$0.091 | |
| Electricity Demand | $283,872 | 21,859 |
kW-mo/yr
|
$12.99 | |
| Natural Gas | $115,257 | 22,151 |
MMBtu
|
$5.20 | |
| Waste Disposal Costs | |||||
| Water Usage | $8,666 | 3,978 |
Tgal
|
$2.18 | |
| Water Disposal | $10,383 | 3,978 |
Tgal
|
$2.61 | |
| TOTAL YEARLY COSTS | $1,064,830 | ||||
| RECOMMENDED SAVINGS* | $214,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $83,523 | $250,000 |
$73,002
804,871
kWh
|
- |
$10,521
-
MMBtu
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,407 | $4,800 |
$30,407
335,248
kWh
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,893 | $157,700 |
$25,893
285,489
kWh
|
- | - | - | |
| 04 | 2.1224: Replace boiler | $18,200 | $104,000 | - | - |
$18,200
-
MMBtu
|
- | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,687 | - | - |
$16,687
-
kW-mo/yr
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,028 | $1,500 |
$12,564
138,256
kWh
|
$2,464
-
kW-mo/yr
|
- | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,333 | - |
$10,333
113,928
kWh
|
- | - | - | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $7,336 | $20,480 |
$7,336
80,890
kWh
|
- | - | - | |
| 09 | 3.4155: Meter waste water | $4,799 | $1,100 | - | - | - |
$4,799
-
Tgal
|
|
| 10 | 2.4237: Substitute compressed air cooling with water or air cooling | $2,373 | $430 |
$2,373
26,164
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $214,579 | $540,010 |
$161,908
1,784,846
kWh
|
$19,151
-
kW-mo/yr
|
$28,721
-
MMBtu
|
$4,799
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs