180
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0309 #10 Y:2023 | 10 | 2023 | Substitute compressed air cooling with water or air cooling | $2,373 | $430 | |
TT0309 #09 Y:2023 | 09 | 2023 | Meter waste water | $4,799 | $1,100 | |
TT0309 #08 Y:2023 | 08 | 2023 | Eliminate or reduce compressed air usage | $7,336 | $20,480 | |
TT0309 #07 Y:2023 | 07 | 2023 | Turn off equipment during breaks, reduce operating time | $10,333 | - | |
TT0309 #06 Y:2023 | 06 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,028 | $1,500 | |
TT0309 #05 Y:2023 | 05 | 2023 | Reschedule plant operations or reduce load to avoid peaks | $16,687 | - | |
TT0309 #04 Y:2023 | 04 | 2023 | Replace boiler | $18,200 | $104,000 | |
TT0309 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $25,893 | $157,700 | |
TT0309 #02 Y:2023 | 02 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $30,407 | $4,800 | |
TT0309 #01 Y:2023 | 01 | 2023 | Use computer programs to optimize hvac performance | $83,523 | $250,000 | |
SU0540 #11 Y:2023 | 11 | 2023 | Conserve energy by efficient use of vending machines | $867 | $1,863 |
n/a
|
SU0540 #10 Y:2023 | 10 | 2023 | Utilize higher efficiency lamps and/or ballasts | $60,779 | $108,879 |
n/a
|
SU0540 #09 Y:2023 | 09 | 2023 | Install occupancy sensors | $3,016 | $3,253 |
n/a
|
SU0540 #08 Y:2023 | 08 | 2023 | Utilize higher efficiency lamps and/or ballasts | $633 | $352 |
n/a
|
SU0540 #07 Y:2023 | 07 | 2023 | Repair and eliminate steam leaks | $3,844 | $1,670 |
n/a
|
SU0540 #06 Y:2023 | 06 | 2023 | Install compressor air intakes in coolest locations | $7,990 | $1,122 |
n/a
|
SU0540 #05 Y:2023 | 05 | 2023 | Use or replace with energy efficient substitutes | $9,713 | $788 |
n/a
|
SU0540 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,574 | $1,108 |
n/a
|
SU0540 #03 Y:2023 | 03 | 2023 | Recharge batteries on during off-peak demand periods | $8,316 | - |
n/a
|
SU0540 #02 Y:2023 | 02 | 2023 | Disconnect ballasts | $568 | - |
n/a
|