Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Orthopedic, prosthetic, and surgical appliances and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0060 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $268 $463
IP0060 #08 Y:2015 Use magnetic technology to treat water $300 $416
IP0060 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $4,644 $3,840
IP0060 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,749 $638
IP0060 #05 Y:2015 Install occupancy sensors $3,107 $725
IP0060 #04 Y:2015 Use or replace with energy efficient substitutes $19,256 $2,750
IP0060 #03 Y:2015 Utilize energy-efficient belts and other improved mechanisms $15,282 $1,568
IP0060 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $26,162 $220
IP0060 #01 Y:2015 Lower temperature during the winter season and vice-versa $5,498 $30
MI0290 #14 Y:2015 Keep doors and windows shut when not on use $396 $317
MI0290 #13 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $1,396 $3,240
MI0290 #12 Y:2015 Reduce heat gain by window tinting $1,443 $2,240
MI0290 #11 Y:2015 Reduce illumination to minimum necessary levels $1,703 $1,080
MI0290 #10 Y:2015 Change rate schedules or other changes in utility service $1,792 $280
MI0290 #09 Y:2015 Reduce the pressure of compressed air to the minimum required $2,622 $40
MI0290 #08 Y:2015 Install occupancy sensors $3,248 $2,165
MI0290 #07 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $3,847 $6,880
MI0290 #06 Y:2015 Clean or color roof to reduce solar load $5,225 $15,465
MI0290 #05 Y:2015 Lower ceiling to reduce conditioned space $5,243 $6,421
MI0290 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,730 $16,200