ITAC Assessment: IP0060
ITAC logo
ITAC Assessment: IP0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Spinal Implants/Medical Devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 150,000
ft2
Annual Production 1,927,626
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $798,606 11,189,720
kWh
Electricity Demand $194,499 21,141
kW-mo/yr
Electricity Fees $1,968 -
Natural Gas $24,246 3,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7221: Lower temperature during the winter season and vice-versa $5,498 $30 - - $5,498
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,162 $220 $26,162
366,408
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,282 $1,568 $15,023
210,412
kWh
$259
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $19,256 $2,750 $19,256
269,694
kWh
- - -
05 2.7135: Install occupancy sensors $3,107 $725 $3,107
43,509
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,749 $638 $1,449
20,300
kWh
$300
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,644 $3,840 $3,849
53,914
kWh
$795
-
kW-mo/yr
- -
08 3.4145: Use magnetic technology to treat water $300 $416 - - - $300
-
Tgal
09 2.7142: Utilize higher efficiency lamps and/or ballasts $268 $463 $268
3,744
kWh
- - -
TOTAL RECOMMENDED $76,266 $10,650 $69,114
967,981
kWh
$1,354
-
kW-mo/yr
$5,498
-
MMBtu
$300
-
Tgal
TOTAL IMPLEMENTED $56,442 $7,021 $49,590
694,543
kWh
$1,354
-
kW-mo/yr
$5,498
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs