| Assessment Year | 2016 |
|---|---|
| Principal Product | Spinal Implants/Medical Devices |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
150,000
ft2
|
| Annual Production | 1,927,626
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $798,606 | 11,189,720 |
kWh
|
$0.071 |
| Electricity Demand | $194,499 | 21,141 |
kW-mo/yr
|
$9.20 |
| Electricity Fees | $1,968 | - |
|
- |
| Natural Gas | $24,246 | 3,276 |
MMBtu
|
$7.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,266 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,442 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $5,498 | $30 | - | - |
$5,498
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $26,162 | $220 |
$26,162
366,408
kWh
|
- | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15,282 | $1,568 |
$15,023
210,412
kWh
|
$259
-
kW-mo/yr
|
- | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $19,256 | $2,750 |
$19,256
269,694
kWh
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $3,107 | $725 |
$3,107
43,509
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,749 | $638 |
$1,449
20,300
kWh
|
$300
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,644 | $3,840 |
$3,849
53,914
kWh
|
$795
-
kW-mo/yr
|
- | - | |
| 08 | 3.4145: Use magnetic technology to treat water | $300 | $416 | - | - | - |
$300
-
Tgal
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $268 | $463 |
$268
3,744
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $76,266 | $10,650 |
$69,114
967,981
kWh
|
$1,354
-
kW-mo/yr
|
$5,498
-
MMBtu
|
$300
-
Tgal
|
||
| TOTAL IMPLEMENTED | $56,442 | $7,021 |
$49,590
694,543
kWh
|
$1,354
-
kW-mo/yr
|
$5,498
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs