matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0302 #12 Y:2005 | 12 | 2005 | Minimize water usage | $2,375 | $1,725 | |
| BD0302 #11 Y:2005 | 11 | 2005 | Use most efficient type of electric motors | $304 | $2,550 | |
| BD0302 #10 Y:2005 | 10 | 2005 | Utilize controls to operate equipment only when needed | $344 | $500 | |
| BD0302 #09 Y:2005 | 09 | 2005 | Reduce the pressure of compressed air to the minimum required | $384 | - | |
| BD0302 #08 Y:2005 | 08 | 2005 | Replace electrically-operated equipment with fossil fuel equipment | $1,195 | $1,550 | |
| BD0302 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1 | - | |
| BD0302 #06 Y:2005 | 06 | 2005 | Install occupancy sensors | $835 | $1,050 | |
| BD0302 #05 Y:2005 | 05 | 2005 | Use / purchase optimum sized compressor | $848 | $260 | |
| BD0302 #04 Y:2005 | 04 | 2005 | Lower temperature during the winter season and vice-versa | $1,130 | - | |
| BD0302 #03 Y:2005 | 03 | 2005 | Use radiant heater for spot heating | $1,699 | $5,000 | |
| BD0302 #02 Y:2005 | 02 | 2005 | Lower temperature during the winter season and vice-versa | $3,381 | - | |
| BD0302 #01 Y:2005 | 01 | 2005 | Reduce illumination to minimum necessary levels | $3,774 | - | |
| BD0174 #09 Y:2000 | 09 | 2000 | Clear and rent existing space | $45,120 | $20,000 | |
| BD0174 #08 Y:2000 | 08 | 2000 | Add equipment/ operators to reduce production bottleneck | $218,400 | $61,810 | |
| BD0174 #07 Y:2000 | 07 | 2000 | Increase amount of waste recovered for resale | $526 | $500 | |
| BD0174 #06 Y:2000 | 06 | 2000 | Reuse / recycle/ sell paper products | $854 | $250 | |
| BD0174 #05 Y:2000 | 05 | 2000 | Lease / purchase baler; sell cardboard to recycler | $1,090 | $400 | |
| BD0174 #04 Y:2000 | 04 | 2000 | Utilize higher efficiency lamps and/or ballasts | $487 | $385 | |
| BD0174 #03 Y:2000 | 03 | 2000 | Install occupancy sensors | $2,138 | $1,800 | |
| BD0174 #02 Y:2000 | 02 | 2000 | Add equipment/ operators to reduce production bottleneck | $2,542 | $2,000 |