Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Instruments for measuring and testing of electricity and electrical signals
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0524 #10 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $954 $2,390
SD0524 #09 Y:2015 Lower ceiling to reduce conditioned space $2,073 $5,877
SD0524 #08 Y:2015 Install occupancy sensors $3,754 $1,310
SD0524 #07 Y:2015 Reduce the pressure of compressed air to the minimum required $4,363 $800
SD0524 #06 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $11,814 $18,199
SD0524 #05 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $13,124 $7,975
SD0524 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $14,433 $30,898
SD0524 #03 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $14,569 $4,000
SD0524 #02 Y:2015 Replace existing hvac unit with high efficiency model $69,647 $181,800
SD0524 #01 Y:2015 Install equipment to utilize waste fuel $116,648 $532,759
LM0071 #10 Y:2003 Clean or color roof to reduce solar load $84,322 $100,000
LM0071 #09 Y:2003 Modify storage space to avoid rental of a warehouse $252,500 $35,000
LM0071 #08 Y:2003 Train operators for maximum operating efficiency $214,912 $3,000
LM0071 #07 Y:2003 Modify current incentive program $3,000 $300
LM0071 #06 Y:2003 Utilize controls to operate equipment only when needed $99,668 $24,000
LM0071 #05 Y:2003 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,879 -
LM0071 #04 Y:2003 Install occupancy sensors $1,330 $1,200
LM0071 #03 Y:2003 Utilize energy-efficient belts and other improved mechanisms $8,163 $945
LM0071 #02 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $80,552 $121,600
LM0071 #01 Y:2003 Use most efficient type of electric motors $3,818 $1,176