ITAC Assessment: SD0524
ITAC logo
ITAC Assessment: SD0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Electronics testing platforms
NAICS 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 330,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $723,468 6,348,364
kWh
Electricity Demand $430,707 15,461
kW-mo/yr
Electricity Fees $4,407 -
Natural Gas $7,280 902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $251,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.1336: Install equipment to utilize waste fuel $116,648 $532,759 $66,728
593,666
kWh
$49,920
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $69,647 $181,800 $41,529
369,476
kWh
$28,118
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,569 $4,000 $8,501
75,625
kWh
$6,068
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,433 $30,898 $10,438
92,868
kWh
$4,620
-
kW-mo/yr
$(-625.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,124 $7,975 $9,213
81,966
kWh
$3,911
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,814 $18,199 $8,727
77,645
kWh
$3,087
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,363 $800 $4,363
38,817
kWh
- -
08 2.7135: Install occupancy sensors $3,754 $1,310 $3,754
33,393
kWh
- -
09 2.7292: Lower ceiling to reduce conditioned space $2,073 $5,877 $1,379
12,281
kWh
$694
-
kW-mo/yr
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $954 $2,390 $954
8,487
kWh
- -
TOTAL RECOMMENDED $251,379 $786,008 $155,586
1,384,224
kWh
$96,418
-
kW-mo/yr
$(-625.0)
TOTAL IMPLEMENTED $16,878 $9,285 $12,967
115,359
kWh
$3,911
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs