Assessment Year | 1999 |
---|---|
Principal Product | Heat Treating |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 34 |
Plant Area |
15,823
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,965 | 2,234,467 |
kWh
|
$0.041 |
Electricity Demand | $109,392 | 9,114 |
kW-mo/yr
|
$12.00 |
Electricity Fees | $1,251 | - |
|
- |
Natural Gas | $2,887 | 497 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $39,862 | $80,000 |
$27,748
764,361
kWh
|
$25,200
-
kW-mo/yr
|
$(-13,086.0)
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,214 | $1,200 |
$742
20,516
kWh
|
$472
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,289 | $1,220 |
$874
24,033
kWh
|
$415
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $949 | $375 |
$458
12,603
kWh
|
$491
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $303 | $240 |
$174
4,689
kWh
|
$129
-
kW-mo/yr
|
- | - | |
06 | 3.4151: Minimize water usage | $244 | $1,120 | - | - | - |
$244
-
Tgal
|
|
TOTAL RECOMMENDED | $43,861 | $84,155 |
$29,996
826,202
kWh
|
$26,707
-
kW-mo/yr
|
$(-13,086.0)
-
MMBtu
|
$244
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs