| Assessment Year | 1999 |
|---|---|
| Principal Product | Heat Treating |
| NAICS |
n/a
|
| SIC | 3398: Metal Heat Treating |
| Sales Range | $1 M to 5M |
| # of Employees | 34 |
| Plant Area |
15,823
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $90,965 | 2,234,467 |
kWh
|
$0.041 |
| Electricity Demand | $109,392 | 9,114 |
kW-mo/yr
|
$12.00 |
| Electricity Fees | $1,251 | - |
|
- |
| Natural Gas | $2,887 | 497 |
MMBtu
|
$5.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $39,862 | $80,000 |
$27,748
764,361
kWh
|
$25,200
-
kW-mo/yr
|
$(-13,086.0)
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,214 | $1,200 |
$742
20,516
kWh
|
$472
-
kW-mo/yr
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,289 | $1,220 |
$874
24,033
kWh
|
$415
-
kW-mo/yr
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $949 | $375 |
$458
12,603
kWh
|
$491
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $303 | $240 |
$174
4,689
kWh
|
$129
-
kW-mo/yr
|
- | - | |
| 06 | 3.4151: Minimize water usage | $244 | $1,120 | - | - | - |
$244
-
Tgal
|
|
| TOTAL RECOMMENDED | $43,861 | $84,155 |
$29,996
826,202
kWh
|
$26,707
-
kW-mo/yr
|
$(-13,086.0)
-
MMBtu
|
$244
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs