ITAC Assessment: BD0045
ITAC logo
ITAC Assessment: BD0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Canned vegetables
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 157,000
ft2
Annual Production 1,250,000
pieces
Production Hrs. Annual 3,910
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,201 1,892,732
kWh
Natural Gas $95,083 52,784
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $4,153 $16,580 $4,153
57,151
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,302 $5,503 $3,302
45,428
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $758 $797 $758
10,551
kWh
04 2.4314: Use synthetic lubricant $667 $480 $667
9,086
kWh
05 2.7135: Install occupancy sensors $314 $375 $314
4,396
kWh
06 2.7111: Reduce illumination to minimum necessary levels $259 $100 $259
3,517
kWh
TOTAL RECOMMENDED $9,453 $23,835 $9,453
130,129
kWh
TOTAL IMPLEMENTED $4,153 $16,580 $4,153
57,151
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs