ITAC Assessment: UD0432
ITAC logo
ITAC Assessment: UD0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product blowers, fans
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 75,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,194 711,606
kWh
Natural Gas $53,194 2,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,156 $75,000 $1,156
-
kWh
02 2.7122: Disconnect ballasts $382 $2,400 $382
11,430
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $772 $46,256 $772
23,154
kWh
TOTAL RECOMMENDED $2,310 $123,656 $2,310
34,584
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs