ITAC Assessment: UU0103
ITAC logo
ITAC Assessment: UU0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product printed materials
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,513 563,820
kWh
Electricity Demand $28,998 2,655
kW-mo/yr
Natural Gas $25,905 2,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,610 $1,995 $1,760
62,730
kWh
$850
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $560 $25 $380
13,400
kWh
$180
-
kW-mo/yr
-
03 2.4237: Substitute compressed air cooling with water or air cooling $2,760 $212 $1,860
66,130
kWh
$900
-
kW-mo/yr
-
04 2.4156: Establish a preventative maintenance program $47,500 $23,700 - - $47,500
05 2.3191: Use demand controller or load shedder $6,510 $5,000 - $6,510
-
kW-mo/yr
-
06 4.821: Pay bills on time to avoid late fees $706 - - - $706
07 4.652: Replace existing equipment with more suitable substitutes $50 $115 $50
1,935
kWh
- -
08 2.7144: Install spectral reflectors / delamp $730 $6,080 $730
26,090
kWh
- -
TOTAL RECOMMENDED $61,426 $37,127 $4,780
170,285
kWh
$8,440
-
kW-mo/yr
$48,206
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs