Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and analytical, optical, measuring, and controlling instruments
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1101 #11 Y:2024 Optimize plant power factor $1,101 $4,400
UD1101 #10 Y:2024 Install occupancy sensors $94 -
UD1101 #09 Y:2024 Reduce illumination to minimum necessary levels $310 $1,350
UD1101 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $430 $1,040
UD1101 #07 Y:2024 Recover waste heat from equipment $2,622 $4,975
UD1101 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,266 $952
UD1101 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,284 -
UD1101 #04 Y:2024 Install compressor air intakes in coolest locations $1,619 $1,015
UD1101 #03 Y:2024 Eliminate or reduce compressed air usage $4,750 $7,500
UD1101 #02 Y:2024 Eliminate or reduce compressed air usage $9,997 $6,792
UD1101 #01 Y:2024 Turn off equipment when not in use $8,143 -
AS0597 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $710 $225
AS0597 #06 Y:2024 Install spectral reflectors / delamp $888 $389
AS0597 #05 Y:2024 Use computer programs to optimize hvac performance $2,499 $3,310
AS0597 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,605 $9,885
AS0597 #03 Y:2024 Change rate schedules or other changes in utility service $6,087 $583
AS0597 #02 Y:2024 Change rate schedules or other changes in utility service $35,049 $583
AS0597 #01 Y:2024 Use solar heat to make electricty $35,454 $296,882
UF0624 #08 Y:2024 Level zero – install control systems for existing equipment $23,221 $60,000
UF0624 #07 Y:2024 Replace old machine with new automatic multi-station tool $38,400 $100,000