| Assessment Year | 2025 |
|---|---|
| Principal Product | Leak and flow testers |
| NAICS | 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
| SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
14,511
ft2
|
| Annual Production | 650
units
|
| Production Hrs. Annual | 2,730
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $18,713 | 131,555 |
kWh
|
$0.14 |
| Electricity Fees | $5,619 | - |
|
- |
| Natural Gas | $6,994 | 818 |
MMBtu
|
$8.55 |
| Other Gas | $413 | 1 |
MMBtu
|
$412.81 |
| TOTAL YEARLY COSTS | $31,738 | |||
| RECOMMENDED SAVINGS* | $7,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7291: Reschedule and rearrange multiple-source heating systems | $3,489 | $1,000 |
$3,489
24,570
kWh
|
- | - | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $2,011 | $36,390 |
$917
6,458
kWh
|
$94
-
MMBtu
|
$1,000 | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $181 | - |
$181
1,271
kWh
|
- | - | |
| 04 | 2.7134: Use photocell controls | $380 | $834 |
$380
2,676
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $486 | $179 |
$486
3,426
kWh
|
- | - | |
| 06 | 2.7423: Reduce heat gain by window tinting | $1,198 | $5,875 |
$1,198
8,439
kWh
|
- | - | |
| 07 | 2.7444: Close holes and openings in building such as broken windows | $80 | $125 |
$30
214
kWh
|
$49
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $7,824 | $44,403 |
$6,681
47,055
kWh
|
$143
-
MMBtu
|
$1,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||