Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,319

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0470 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,209 $10,510
MI0470 #04 Y:2025 Install occupancy sensors $2,919 $5,000
MI0470 #03 Y:2025 Lower temperature during the winter season and vice-versa $6,557 -
MI0470 #02 Y:2025 Reduce space conditioning during non-working hours $1,285 -
MI0470 #01 Y:2025 Utilize daylight whenever possible in lieu of artificial light $1,600 -
SU0589 #14 Y:2025 Insulate bare equipment $69 $384
SU0589 #13 Y:2025 Install / repair insulation on condensate lines $17 $68
SU0589 #12 Y:2025 Insulate bare equipment $50 $185
SU0589 #11 Y:2025 Install vinyl strip / high speed / air curtain doors $1,046 $3,573
SU0589 #10 Y:2025 Install an uninteruptable power supply $160,000 $480,000
SU0589 #09 Y:2025 Use or replace with energy efficient substitutes $975 $1,642
SU0589 #08 Y:2025 Conserve energy by efficient use of vending machines $1,631 $1,642
SU0589 #07 Y:2025 Install occupancy sensors $2,093 $1,943
SU0589 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $41,161 $16,667
SU0589 #05 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $37,186 $3,500
SU0589 #04 Y:2025 Use or replace with energy efficient substitutes $3,325 $313
SU0589 #03 Y:2025 Eliminate or reduce compressed air usage $37,179 -
SU0589 #02 Y:2025 Disconnect ballasts $3,513 -
SU0589 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $18,704 -
LE0604 #09 Y:2025 Replace existing hvac unit with high efficiency model $13,939 $42,829