Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,227

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2508 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,248 $2,210
UC2508 #05 Y:2025 Utilize controls to operate equipment only when needed $18,450 $50
UC2508 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $6,573 $150
UC2508 #03 Y:2025 Use solar heat to make electricty $86,822 $892,123
UC2508 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,747 $3,380
UC2508 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $18,322 $42,474
MS0447 #06 Y:2025 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,030,279 $11,484,200
MS0447 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $144,047 $116,128
MS0447 #04 Y:2025 Replace obsolete burners with more efficient ones $43,724 $145,930
MS0447 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $56,915 $6,958
MS0447 #02 Y:2025 Upgrade obsolete equipment $80,000 $30,005
MS0447 #01 Y:2025 Use solar heat to make electricty $668,474 $6,707,386
OR0806 #05 Y:2025 Adopt in-house material generation $15,683 $76,301
OR0806 #04 Y:2025 Replace existing hvac unit with high efficiency model $1,542 $5,699
OR0806 #03 Y:2025 Insulate bare equipment $3,880 $211
OR0806 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,490 $1,927
OR0806 #01 Y:2025 Use solar heat to make electricty $56,788 $960,069
SF0632 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $15,394 $12,341
SF0632 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $173 $158
SF0632 #02 Y:2024 Turn off equipment when not in use $723 -