Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring, analyzing, and controlling instruments; photographic, medical and optical goods; watches and clocks
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AT0100 #05 Y:1988 Utilize energy-efficient belts and other improved mechanisms $259 -
AT0100 #04 Y:1988 Use most efficient type of electric motors $192 $286
AT0100 #03 Y:1988 Install timers and/or thermostats $16,816 $3,200
AT0100 #02 Y:1988 Reduce illumination to minimum necessary levels $3,734 $8,672
AT0100 #01 Y:1988 Use computer programs to optimize hvac performance $9,945 $21,000
AT0050 #05 Y:1986 Reduce ventilation air $8,542 $203
AT0050 #04 Y:1986 Recover waste heat from equipment $361 $300
AT0050 #03 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $14,822 $20,000
AT0050 #02 Y:1986 Utilize outside air instead of conditioned air for drying $6,892 $1,700
AT0050 #01 Y:1986 Reduce the pressure of compressed air to the minimum required $859 $400
AT0018 #06 Y:1985 Reduce the pressure of compressed air to the minimum required $718 -
AT0018 #05 Y:1985 Install timers and/or thermostats $9,397 $275
AT0018 #04 Y:1985 Utilize higher efficiency lamps and/or ballasts $188 $43
AT0018 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $1,695 $815
AT0018 #02 Y:1985 Utilize higher efficiency lamps and/or ballasts $210 $360
AT0018 #01 Y:1985 Use most efficient type of electric motors $207 $276