ITAC Assessment: AT0018
ITAC logo
ITAC Assessment: AT0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MEDICAL DEVICES
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,695 3,524,326
kWh
Natural Gas $30,700 4,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,415 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $207 $276 $207
4,689
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $210 $360 $210
4,982
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,695 $815 $1,695
39,273
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $188 $43 $188
4,396
kWh
-
05 2.7261: Install timers and/or thermostats $9,397 $275 - $9,397
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $718 - $718
16,706
kWh
-
TOTAL RECOMMENDED $12,415 $1,769 $3,018
70,046
kWh
$9,397
-
MMBtu
TOTAL IMPLEMENTED $10,115 $275 $718
16,706
kWh
$9,397
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs