ITAC Assessment: NC0167
ITAC logo
ITAC Assessment: NC0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Picture frame moulding
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 60,000
ft2
Annual Production 3,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,847 559,496
kWh
Electricity Demand $22,251 3,829
kW-mo/yr
Fuel Oil #2 $14,557 2,366
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Primary Raw Material Savings By-product Production Savings
01 2.1133: Adjust burners for efficient operation $1,244 $2,400 - - $1,244
-
MMBtu
- - -
02 2.7313: Recycle air for heating, ventilation and air conditioning $6,230 $19,535 - - $6,230
-
MMBtu
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $489 $1,100 $489
10,551
kWh
- - - - -
04 2.4133: Use most efficient type of electric motors $1,229 $5,323 $716
15,533
kWh
$513
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $503 $143 $281
6,155
kWh
$222
-
kW-mo/yr
- - - -
06 3.6123: Burn wood by-products for heat $22,545 $80,500 $4,818
104,338
kWh
$3,632
-
kW-mo/yr
$5,095
-
MMBtu
$9,000
-
lb
- -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $43,740 $9,500 - - - - $43,740 -
08 4.322: Eliminate old stock and modify inventory control $25,000 $1,000 - - - - - $25,000
TOTAL RECOMMENDED $100,980 $119,501 $6,304
136,577
kWh
$4,367
-
kW-mo/yr
$12,569
-
MMBtu
$9,000
-
lb
$43,740 $25,000
TOTAL IMPLEMENTED $27,976 $8,866 $997
21,688
kWh
$735
-
kW-mo/yr
$1,244
-
MMBtu
- - $25,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs