ITAC Assessment: MA0855
ITAC logo
ITAC Assessment: MA0855
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 27,400
ft2
Annual Production 797,766
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,429 1,231,400
kWh
Electricity Demand $21,601 2,501
kW-mo/yr
Electricity Fees $3,591 -
Natural Gas $31,582 1,987
MMBtu
TOTAL YEARLY COSTS $238,203
RECOMMENDED SAVINGS* $80,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $63,886 $285,949 $43,063
292,950
kWh
$173
-
kW-mo/yr
$20,650 -
02 2.7234: Use heat pump for space conditioning $3,299 $22,900 $(-25,855.0)
(-175,887)
kWh
$(-2,427.0)
-
kW-mo/yr
- $31,581
-
MMBtu
03 2.6124: Establish equipment maintenance schedule $10,616 $23,709 $9,528
64,824
kWh
$1,088
-
kW-mo/yr
- -
04 3.1191: Change procedures / equipment / operating conditions $1,302 $900 $1,302
8,856
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $747 $550 - - - $747
-
MMBtu
06 2.7234: Use heat pump for space conditioning $988 $385 $914
6,221
kWh
$74
-
kW-mo/yr
- -
TOTAL RECOMMENDED $80,838 $334,393 $28,952
196,964
kWh
$(-1,092.0)
-
kW-mo/yr
$20,650 $32,328
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs