Assessment Year | 2023 |
---|---|
Principal Product | Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $5 M to 10M |
# of Employees | 10 |
Plant Area |
27,400
ft2
|
Annual Production | 797,766
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $181,429 | 1,231,400 |
kWh
|
$0.15 |
Electricity Demand | $21,601 | 2,501 |
kW-mo/yr
|
$8.64 |
Electricity Fees | $3,591 | - |
|
- |
Natural Gas | $31,582 | 1,987 |
MMBtu
|
$15.89 |
TOTAL YEARLY COSTS | $238,203 | |||
RECOMMENDED SAVINGS* | $80,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $63,886 | $285,949 |
$43,063
292,950
kWh
|
$173
-
kW-mo/yr
|
$20,650 | - | |
02 | 2.7234: Use heat pump for space conditioning | $3,299 | $22,900 |
$(-25,855.0)
(-175,887)
kWh
|
$(-2,427.0)
-
kW-mo/yr
|
- |
$31,581
-
MMBtu
|
|
03 | 2.6124: Establish equipment maintenance schedule | $10,616 | $23,709 |
$9,528
64,824
kWh
|
$1,088
-
kW-mo/yr
|
- | - | |
04 | 3.1191: Change procedures / equipment / operating conditions | $1,302 | $900 |
$1,302
8,856
kWh
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $747 | $550 | - | - | - |
$747
-
MMBtu
|
|
06 | 2.7234: Use heat pump for space conditioning | $988 | $385 |
$914
6,221
kWh
|
$74
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $80,838 | $334,393 |
$28,952
196,964
kWh
|
$(-1,092.0)
-
kW-mo/yr
|
$20,650 |
$32,328
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs