Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Guided missiles and space vehicles
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0599 #11 Y:2026 Use solar heat to make electricty $247,587 $4,721,768
SU0599 #10 Y:2026 Use or replace with energy efficient substitutes $21,494 $143,758
SU0599 #09 Y:2026 Replace existing hvac unit with high efficiency model $11,060 $26,128
SU0599 #08 Y:2026 Chill water to the highest temperature possible $79 $143
SU0599 #07 Y:2026 Conserve energy by efficient use of vending machines $3,195 $5,578
SU0599 #06 Y:2026 Install compressor air intakes in coolest locations $1,079 $1,860
SU0599 #05 Y:2026 Install / repair insulation on steam lines $671 $329
SU0599 #04 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $5,185 $1,534
SU0599 #03 Y:2026 Install / repair insulation on steam lines $2,106 $566
SU0599 #02 Y:2026 Eliminate/reduce an operation $39,205 -
SU0599 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,426 -
UW2407 #06 Y:2024 Improve air circulation with destratification fans / other methods $4,140 $14,800
UW2407 #05 Y:2024 Install occupancy sensors $2,085 $28,384
UW2407 #04 Y:2024 Replace existing equipment with more suitable substitutes $7,000 $9,000
UW2407 #03 Y:2024 Turn off equipment when not in use $207,284 $100
UW2407 #02 Y:2024 Replace existing chiller with high efficiency model $90,353 $650,364
UW2407 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $69,227 $25,000
OK0298 #09 Y:1989 Eliminate or reduce compressed air usage $148 $270
OK0298 #08 Y:1989 Utilize energy-efficient belts and other improved mechanisms $1,310 $3,106
OK0298 #07 Y:1989 Recover waste heat from equipment $1,620 $980