Assessment Year | 2024 |
---|---|
Principal Product | Guided Missile and Space Vehicle Manufacturing |
NAICS | 336414: Guided Missile and Space Vehicle Manufacturing |
SIC | 3761: Guided Missiles and Space Vehicles |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
152,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $889,456 | 8,503,400 |
kWh
|
$0.10 |
Electricity Demand | $61,098 | 11,930 |
kW-mo/yr
|
$5.12 |
Natural Gas | $9,371 | 702 |
MMBtu
|
$13.35 |
TOTAL YEARLY COSTS | $959,925 | |||
RECOMMENDED SAVINGS* | $380,089 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $69,227 | $25,000 |
$64,874
620,208
kWh
|
$4,353
-
kW-mo/yr
|
- | |
02 | 2.2622: Replace existing chiller with high efficiency model | $90,353 | $650,364 |
$90,353
863,794
kWh
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $207,284 | $100 |
$194,255
1,857,120
kWh
|
$13,029
-
kW-mo/yr
|
- | |
04 | 4.652: Replace existing equipment with more suitable substitutes | $7,000 | $9,000 | - | - | $7,000 | |
05 | 2.7135: Install occupancy sensors | $2,085 | $28,384 |
$2,085
18,615
kWh
|
- | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $4,140 | $14,800 |
$4,140
39,579
kWh
|
- | - | |
TOTAL RECOMMENDED | $380,089 | $727,648 |
$355,707
3,399,316
kWh
|
$17,382
-
kW-mo/yr
|
$7,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs