Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Railroad equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0362 #06 Y:2024 Install vinyl strip / high speed / air curtain doors $5,618 $5,088
MZ0362 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $211,626 $267,427
MZ0362 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,037 $2,400
MZ0362 #03 Y:2024 Eliminate or reduce compressed air usage $2,937 $816
MZ0362 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $11,598 $720
MZ0362 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,699 $540
SU0552 #15 Y:2024 Use solar heat to make electricty $74,963 $432,940
SU0552 #14 Y:2024 Conserve energy by efficient use of vending machines $720 $1,363
SU0552 #13 Y:2024 Replace fossil fuel equipment with electrical equipment $9,592 $16,120
SU0552 #12 Y:2024 Install occupancy sensors $3,131 $4,437
SU0552 #11 Y:2024 Utilize higher efficiency lamps and/or ballasts $11,027 $14,014
SU0552 #10 Y:2024 Use insulation in furnaces to facilitate heating / cooling $466 $271
SU0552 #09 Y:2024 Insulate glazing, walls, ceilings, and roofs $33,762 $6,532
SU0552 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,971 $224
SU0552 #07 Y:2024 Use or replace with energy efficient substitutes $8,427 $212
SU0552 #06 Y:2024 Apply for tax-free status for energy purchases $13,486 $168
SU0552 #05 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,579 -
SU0552 #04 Y:2024 Recharge batteries on during off-peak demand periods $7,179 -
SU0552 #03 Y:2024 Eliminate or reduce compressed air usage $6,891 -
SU0552 #02 Y:2024 Pay bills on time to avoid late fees $1,162 -