Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ship building and repairing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0161 #08 Y:1992 Install timers and/or thermostats $280 $450
AM0161 #07 Y:1992 Turn off equipment when not in use $690 -
AM0161 #06 Y:1992 Change rate schedules or other changes in utility service $2,205 $5,050
AM0161 #05 Y:1992 Reduce illumination to minimum necessary levels $2,420 -
AM0161 #04 Y:1992 Reduce illumination to minimum necessary levels $3,290 $985
AM0161 #03 Y:1992 Reschedule plant operations or reduce load to avoid peaks $3,855 -
AM0161 #02 Y:1992 Reduce load on electrical conductor to reduce heating losses $4,700 $2,255
AM0161 #01 Y:1992 Eliminate leaks in inert gas and compressed air lines/ valves $5,600 $630
AM0162 #04 Y:1992 Reduce illumination to minimum necessary levels $700 $215
AM0162 #03 Y:1992 Eliminate leaks in inert gas and compressed air lines/ valves $1,010 $300
AM0162 #02 Y:1992 Install adequate dryers on air lines to eliminate blowdown $1,150 $5,746
AM0162 #01 Y:1992 Turn off equipment during breaks, reduce operating time $2,720 $782