18
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Aircraft | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0416 #05 Y:2005 | 05 | 2005 | Use solar heat to heat water | $345 | $2,050 | |
| AS0416 #04 Y:2005 | 04 | 2005 | Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $1,237 | - | |
| AS0416 #03 Y:2005 | 03 | 2005 | Pay bills on time to avoid late fees | $3,096 | - | |
| AS0416 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $3,872 | $34,827 | |
| AS0416 #01 Y:2005 | 01 | 2005 | Install vinyl strip / high speed / air curtain doors | $31,751 | $36,000 | |
| UF0371 #13 Y:2005 | 13 | 2005 | Improve space comfort conditioning | $100,000 | $50,000 | |
| UF0371 #12 Y:2005 | 12 | 2005 | Re-arrange equipment layout to reduce handling costs | $100,000 | $25,000 | |
| UF0371 #11 Y:2005 | 11 | 2005 | Improve space comfort conditioning | $1,596 | $26,800 | |
| UF0371 #10 Y:2005 | 10 | 2005 | Redesign process | $61,200 | $1,000,000 | |
| UF0371 #09 Y:2005 | 09 | 2005 | Lower ceiling to reduce conditioned space | $5,477 | $800 | |
| UF0371 #08 Y:2005 | 08 | 2005 | Make a practice of turning off lights when not needed | $3,385 | - | |
| UF0371 #07 Y:2005 | 07 | 2005 | Install compressor air intakes in coolest locations | $18,424 | - | |
| UF0371 #06 Y:2005 | 06 | 2005 | Use computer programs to optimize hvac performance | $7,254 | $20,000 | |
| UF0371 #05 Y:2005 | 05 | 2005 | Install occupancy sensors | $2,952 | $4,688 | |
| UF0371 #04 Y:2005 | 04 | 2005 | Utilize higher efficiency lamps and/or ballasts | $2,453 | $675 | |
| UF0371 #03 Y:2005 | 03 | 2005 | Lower light fixtures in high ceiling areas | $6,271 | $1,680 | |
| UF0371 #02 Y:2005 | 02 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,368 | $650 | |
| UF0371 #01 Y:2005 | 01 | 2005 | Lower ceiling to reduce conditioned space | $6,120 | $978 |