Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,633

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicles and motor vehicle equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0591 #09 Y:2026 Convert to indirect temperature control system $8,490 $75,000
SU0591 #08 Y:2026 Insulate glazing, walls, ceilings, and roofs $480 $1,980
SU0591 #07 Y:2026 Install vinyl strip / high speed / air curtain doors $963 $2,290
SU0591 #06 Y:2026 Insulate glazing, walls, ceilings, and roofs $3,991 $8,000
SU0591 #05 Y:2026 Conserve energy by efficient use of vending machines $699 $561
SU0591 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,169 $581
SU0591 #03 Y:2026 Use or replace with energy efficient substitutes $2,563 $80
SU0591 #02 Y:2026 Apply for tax-free status for energy purchases $12,170 $91
SU0591 #01 Y:2026 Eliminate or reduce compressed air usage $400 -
UC2601 #10 Y:2026 Optimize plant power factor $8,766 $30,464
UC2601 #09 Y:2026 Make a practice of turning off lights when not needed $4,711 -
UC2601 #08 Y:2026 Install occupancy sensors $12,838 $3,840
UC2601 #07 Y:2026 Insulate bare equipment $11,998 $7,750
UC2601 #06 Y:2026 Replace existing chiller with high efficiency model $60,580 $184,500
UC2601 #05 Y:2026 Use or replace with energy efficient substitutes $2,654 $20,000
UC2601 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,281 $1,365
UC2601 #03 Y:2026 Install compressor air intakes in coolest locations $23,854 $30,000
UC2601 #02 Y:2026 Recover waste heat from equipment $73,769 $9,905
UC2601 #01 Y:2026 Utilize controls to operate equipment only when needed $104 $303
NL0128 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,832 $3,600