Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,031

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous electrical machinery, equipment, and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2505 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,294 $852
UC2505 #08 Y:2025 Apply for tax-free status for energy purchases $10,963 -
UC2505 #07 Y:2025 Use solar heat to make electricty $55,106 $495,624
UC2505 #06 Y:2025 Replace existing hvac unit with high efficiency model $16,679 $146,490
UC2505 #05 Y:2025 Install timers and/or thermostats $1,138 $1,140
UC2505 #04 Y:2025 Use cooling tower water instead of refrigeration $39,288 $50,000
UC2505 #03 Y:2025 Keep doors and windows shut when not on use $4,253 $2,096
UC2505 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $8,266 $75
UC2505 #01 Y:2025 Air condition only space necessary $2,475 $1,500
IP0206 #06 Y:2024 Use radiant heater for spot heating $1,970 $4,748
IP0206 #05 Y:2024 Install occupancy sensors $1,174 $877
IP0206 #04 Y:2024 Re-use or recycle hot or cold process exhaust air $719 $419
IP0206 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $31,184 $17,042
IP0206 #02 Y:2024 Install compressor air intakes in coolest locations $4,530 $714
IP0206 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,948 $83
OK1134 #04 Y:2024 Change method of deionized water production $257,299 $103,000
OK1134 #03 Y:2024 Recharge batteries on during off-peak demand periods $11,172 -
OK1134 #02 Y:2024 Use solar heat to make electricty $100,152 $858,000
OK1134 #01 Y:2024 Install occupancy sensors $262 -
GT0988 #06 Y:2024 Use solar heat to make electricty $91,923 $962,674