Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,040

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous electrical machinery, equipment, and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1152 #09 Y:2025 Reschedule plant operations or reduce load to avoid peaks $6,238 -
OK1152 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $9,737 $16,196
OK1152 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,701 $9,073
OK1152 #06 Y:2025 Use solar heat to make electricty $24,453 $208,600
OK1152 #05 Y:2025 Replace existing hvac unit with high efficiency model $2,424 $13,000
OK1152 #04 Y:2025 Install outside air damper / economizer on hvac unit $4,489 $20,639
OK1152 #03 Y:2025 Install compressor air intakes in coolest locations $1,965 -
OK1152 #02 Y:2025 Recover waste heat from equipment $5,879 $2,304
OK1152 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,801 -
UC2505 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,294 $852
UC2505 #08 Y:2025 Apply for tax-free status for energy purchases $10,963 -
UC2505 #07 Y:2025 Use solar heat to make electricty $55,106 $495,624
UC2505 #06 Y:2025 Replace existing hvac unit with high efficiency model $9,529 $63,000
UC2505 #05 Y:2025 Install timers and/or thermostats $1,138 $1,140
UC2505 #04 Y:2025 Use cooling tower water instead of refrigeration $39,288 $50,000
UC2505 #03 Y:2025 Keep doors and windows shut when not on use $4,253 $2,096
UC2505 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $8,438 $75
UC2505 #01 Y:2025 Recover waste heat from equipment $2,475 $1,500
IP0206 #06 Y:2024 Use radiant heater for spot heating $1,970 $4,748
IP0206 #05 Y:2024 Install occupancy sensors $1,174 $877